In order to ensure the structural integrity and safety of the facilities at Alba Club, Calciner & Marine, and ALBA Smelter, plant wide underground penetrating radar (GPR) scanning is conducted in open areas. As the scans reveal buried utilities such as electric cable, communication cable, sewer, storm, gas line, compressed air main, portable water, blow down water, process water, buried structures, voids, water leakage etc.